Communicating Information - Survey Order (Interior)

Roof space: * Access to all parts, construction type - traditional or trussed* Evidence of moisture due to condensation - ventilation at eaves, ridge, etc.* Evidence of water penetration - chimney flashings, abutments and valleys* Insulation - type and quantity* Party wall in semi-detached and terraced dwellings - suitability as fire barrier* Plumbing - adequacy of storage cistern, insulation, overflow function Floors: * Construction - timber, pre-cast or cast in-situ concrete? Finish condition?*...

Communicating Information - Survey Order (Exterior)

Estate and garden: * Location and establishment of boundaries* Fences, gates and hedges - material, condition and suitability* Trees - type and height, proximity to building* Pathways and drives - material and condition* Outbuildings - garages, sheds, greenhouses, barns, etc.* Proximity of water courses Roof: * Tile type, treatment at ridge, hips, verge and valleys* Age of covering, repairs, replacements, renewals, general condition, defects and growths* Eaves finish, type and condition* Gutters...

Communicating Information - Survey Preliminaries

Established Procedure † the interested purchaser engages a building surveyor. UK Government Requirements † the seller to provide a property/ home information pack (HIP) which can include `A survey report on the condition of the property, including requirements for urgent or significant repairs . . .'. Survey document preliminaries: * Title and address of property* Client's name, address and contacts* Survey date and time* Property status † freehold, leasehold or commonhold* Occupancy † occupied...

Communicating Information - Building Survey

Construction Defects † correct application of materials produced to the recommendations of British, European and International Standards authorities, in accordance with local building regulations, by-laws and the rules of building guarantee companies, i.e. National House Building Council (NHBC) and MD InsuranceServices, should ensure a sound and functional structure. However, these controls can be seriously undermined if the human factor of quality workmanship is not fulfilled. The following guidance...

Communicating Information - Block and Site Plans

...

Communicating Information - Floor Plans and Elevations

FRONT ELEVATION REAR ELEVATION SIDE ELEVATION (right) GROUMD FLOOR PLAN FRIST FLOOR PLAN SIDE ELEVATION (LEFT) ...

Communicating Information - Perspective Projections

...

Communicating Information - Isometric Projections

Isometric Projections - a pictorial projection of a solid object on a plane surface drawn so that all vertical lines remain vertical and of true scale length, all horizontal lines are drawn at an angle of 30 and are of true scale length therefore scale measurements can be taken on the vertical and 30 lines but cannot be taken on any other inclined line. A similar drawing can be produced using an angle of 45 for all horizontal lines and is called an Axonometric Projection ISOMETRIC PROJECTION...

Communicating Information - Orthographic Projections

Orthographic projection - a means of drawig independent views of a solid object on a plane surface. ...

Drawings - Sketches

Sketch - this can be defined as a draft or rough outline of an idea, it can be a means of depicting a three-dimensional form in a two-dimensional guise. Sketches can be produced free-hand or using rules and set squares to give basic guide lines. All sketches should be clear, show all the necessary detail and above all be in the correct proportions. Sketches can be drawn by observing a solid object or they can be produced from conventional orthographic views but in all cases can usually be successfully...

Drawings Used in the Construction Process

Location Drawings  Site Plans - used to locate site, buildings, define site levels, indicate services to buildings, identify parts ofsite such as roads, footpaths and boundaries and to give setting out dimensions for the site and buildings asa whole. Suitable scale not less than 1 : 2500 Floor Plans - used to identify and set out parts of the building such as rooms, corridors, doors, windows, etc., Suitable scale not less than 1 : 100 Elevations - used to show external appearance of all faces...

Construction Activities - The Documents

ARCHITCTS DRAWINGS ENGINEERS DRAWINGS SCHEDULES  SPECIFICATIONS CONTRACT DOCUMENT ...

Construction Activities - The Site

A Building or Construction Site can be considered as a temporary factory employing the necessary resources to successfully fulfil a contract. ...

Internal Separation and Compartmentation

Dwelling houses Flats   Note: Floors within a maisonette are not required to be "compartment''.  For non-residential buildings, compartment size is limited by floor area depending on the building function (purpose group) and height. Compartment - a building or part of a building with walls and floors constructed to contain fire and to prevent it spreading to another part of the same building or to an adjoining building.  Separating floor/wall ~ element of sound resisting...